NIDC Drills 43-km of Directional Wells

By John Lee.

The National Iranian Drilling Company (NIDC) carried out 43,498 meters of directional and horizontal drilling, in 55 holes, in Iran’s during the first half of the current Iranian fiscal year (started March 20, 2017).

The head of the Special Operations Bureau at the NIDC, Mehran Alipour, told Trend that this is up 16 percent from the same period last year.

The NIDC, which owns 73 drilling rigs, drilled a total of about 142.5 kilometers of oil and gas wells the first six months.

(Source: Trend)

No comments yet.

Leave a Reply